UM Architectural and Engineering Design in Construction Cost Worksheet
Question Description
Please use the below info to breakdown the total budget cost of 181,810,060 using the sample on the attached budget. This assignment would be turned into Turnitin.
The total project budget is $181,810,600, with an estimated construction, operation and maintenance budget of approximately $81,790,000. The construction cost includes Land acquisition, including assembly, holding and improvement, Architectural and engineering design both in 2D and 3D drawings, materials, equipments and labor etc. Also, maintenance and operational cost includes periodic renovation, utilities, and labor. Other miscellaneous expenses would fall under “owner other expenses”.